Citation: Rao Pingping, Liao Qiao, Liu Jiaxin, Wang Rui, Ban Hongxia. Application of Combined BIM and VR Technology in Urban Underground Engineering. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(3): 13-16. doi: 10.16670/j.cnki.cn11-5823/tu.2018.03.03
2018, 10(3): 13-16. doi: 10.16670/j.cnki.cn11-5823/tu.2018.03.03
Application of Combined BIM and VR Technology in Urban Underground Engineering
Department of Civil Engineering, University of Shanghai for Science and Technology, Shanghai 200093, China |
As the urban construction is developing rapidly, the development and utilization of urban underground space has become an important development direction. The combined BIM and VR Technology can be applied in the urban underground engineering. A quality model templates is firstly drawn in virtual environment by using Revit, a BIM software. Then the 3DS MAX software is applied for the lighting, material rendering and animation. The exported animation video in avi format achieves immersive dynamic roaming by using the storm mirror, a VR software. The above technical route solves the construction safety and quality problems caused by the limited construction space and complicated pipelines.
[1] | |
[2] | |
[3] |
唐维, 丁浩, 陈贤国.基于Revit软件建模的BIM技术研究[J].公路交通科技(应用技术版), 2017, (03): 207-209. |
[4] |
李莹.基于3ds Max的建筑虚拟场景建模及优化技术研究[J].计算机光盘软件与应用, 2014, (2): 26-27. |
[5] |
马梓誉, 邢茂俊, 韩旭.基于3DSMAX的建筑动画制作技术[J].艺术科技, 2016, 29(03): 117-119.doi: 10.3969/j.issn.1004-9436.2016.03.102 |
[6] |
李丽, 谢丁龙.基于VR的建筑与城市虚拟实验平台设计研究[J].电化教育研究, 2012, 33(06): 79-82. |
Metrics
- PDF Downloads(63)
- Abstract views(3174)
- HTML views(1651)