Citation: Liu Jiangfan, Qin Yangmin, Wang Xuezhen. BIM Application in Rolling Construction of Steel Truss Installation of Large-Scaled Shanghai Zhongxin Electronic Device Plant. Journal of Information Technologyin Civil Engineering and Architecture, 2020, 12(1): 60-69. doi: 10.16670/j.cnki.cn11-5823/tu.2020.01.09
2020, 12(1): 60-69. doi: 10.16670/j.cnki.cn11-5823/tu.2020.01.09
BIM Application in Rolling Construction of Steel Truss Installation of Large-Scaled Shanghai Zhongxin Electronic Device Plant
Shanghai Baoye Group Co., Ltd., Shanghai 210900, China |
The continuous development of the BIM technology has earned itself more attention and importance than ever in the industrial engineering, especially in the construction engineering of large-scaled micro electronic devices plant for the excellent application effects. In this paper, the practical engineering of Shanghai Zhongxin electronic device plant is studied to achieve the maximum benefits of BIM application. In the early stage of project, BIM is applied for deepening drawings and optimizing construction scheme, and during the project implementation stage, BIM is applied for 3D space management, design optimization, construction visualization, and technical disclosure. BIM is also applied in pre-construction stage to implement collision detection and optimization to avoid reconstruction, material scrapping, construction delay and other problems in construction stage. BIM application also contributes to solving the time consuming problem and difficulties in taking off loadings in traditional steel structure installation. The advantages of the SPMT module transportation vehicle is adopted to develop a new technology of rolling installation of large-span steel truss structure based on the SPMT module vehicle. The loading capacity of waffle board and stability of truss during rolling installation have been both double checked through calculation, ensuring the safety and reliability of the construction of rolling installation, which provides technical supports of the following similar construction of large-span steel roof projects.
[1] |
苏川, 戴超, 王丹, 等.某电子洁净厂房大跨度大面积屋面钢桁架安装关键技术[J].施工技术, 2017(20): 9-11. |
[2] |
任自放, 葛绍群, 颜勇.钢结构桁架累积滑移施工技术[J].钢结构, 2010, 25(9): 65-70.doi: 10.3969/j.issn.1007-9963.2010.09.015 |
[3] |
高兆鑫. SPMT在LNG模块装船过程中的应用[J].石油工程建设, 2016, 42(6): 37-41.doi: 10.3969/j.issn.1001-2206.2016.06.009 |
[4] | |
[5] |
祁金金.做好项目技术管理的"十全十美"[J].建筑工人, 2018(11): 12-14.doi: 10.3969/j.issn.1002-3232.2018.11.005 |
[6] |
赵泽勇.基于BIM的建筑信息系统研究与实现[D]. 2011. |
[7] |
相杰, 张冬, 罗伟, 等. BIM技术在电子厂房建造中的应用研究[J].中国标准化, 2018, 526(14): 86-87.doi: 10.3969/j.issn.1002-5944.2018.14.054 |
[8] |
姜钰蒙, 孟滨, 侯卓群, 等. BIM技术在旧厂房空间改造中的应用[J].电子测试, 2017(10): 112-113.doi: 10.3969/j.issn.1000-8519.2017.10.058 |
[9] |
Metrics
- PDF Downloads(33)
- Abstract views(2081)
- HTML views(997)