• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Wang Kai, Li Jia Jun, Liu Chong, Lin Fan Zhou. Super Large Project Digital Co-design Practice with BIM——In Post Expo B Zone Central Enterprise Headquarters Project. Journal of Information Technologyin Civil Engineering and Architecture, 2014, 6(4): 1-10, 23.

2014, 6(4): 1-10, 23.

Super Large Project Digital Co-design Practice with BIM——In Post Expo B Zone Central Enterprise Headquarters Project

East China Architectural Design & Research Institute CO., LTD., Shanghai 200041, China

Web Publishing Date: 2014-08-01

Fund Project: 上海市课题“后世博大型建筑群体数字化协同管理关键技术课题研究”(课题编号:12dz1203500)第四子课题《超大项目群多元设计的协调体系研究与应用》(课题编号:12dz1203504)的研究成果之一上海市课题“后世博大型建筑群体数字化协同管理关键技术课题研究” 12dz1203500第四子课题《超大项目群多元设计的协调体系研究与应用》 12dz1203504

[1]

《后上海世博B片区央企总部区BIM工作手册》. 2013.

[2]

张晓菲.探讨基于BIM的设计阶段的流程优化.工业建筑, 2013, 07:154-158. 

[3]

张洋. 基于BIM的建筑工程信息集成与管理研究. 清华大学博士论文, 2009.

[4]

张洋. 基于BIM的工程项目集成化建设理论及关键问题研究. 同济大学博士论文, 2010.

[5]

王凯. BIM与传统CAAD在室内方案设计中的对比研究, 2011.

[6]

王凯.国外BIM标准研究[J].土木建筑工程信息技术, 2013, 5(1):6-11. 

Metrics
  • PDF Downloads(9)
  • Abstract views(1272)
  • HTML views(657)
Catalog

Figures And Tables

Super Large Project Digital Co-design Practice with BIM——In Post Expo B Zone Central Enterprise Headquarters Project

Wang Kai, Li Jia Jun, Liu Chong, Lin Fan Zhou

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmxxjs  QQ:342182902  E-mail:tmxxjs@163.com