Citation: Zhou Shuowen, Pang Bo, Pan Yuhua, Zhang Qiang, Lu Yongmao. Analysis on Research Hotspots and Trends Based on BIM Papers. Journal of Information Technologyin Civil Engineering and Architecture, 2020, 12(3): 8-15. doi: 10.16670/j.cnki.cn11-5823/tu.2020.03.02
2020, 12(3): 8-15. doi: 10.16670/j.cnki.cn11-5823/tu.2020.03.02
Analysis on Research Hotspots and Trends Based on BIM Papers
1. | China Academy of Building Research, Beijing 100013, China |
2. | China Waterborne Transport Research Institute, Beijing 100088, China |
3. | Guangdong Simho Intelligent Construction Engineering Co., Ltd., Dongguan 523073, China |
In recent years, the BIM (Building Information Model) technology has already become a key area of modern architecture research. However, there is lacking of analysis on the overall research of BIM in the current research reviews. Therefore, this paper studies 1664 journal literatures on BIM by applying the social network analysis, and makes a quantitative analysis of the current research hotspot, team and trend. In terms of literature statistics, the Journal of Information Technology in Civil Engineering and Architecture is the journal with the most relevant literatures published. In terms of research content, the design and construction management is the core of existing research, and the prefabricated building is an important research object. The research of BIM has been going deep into every stage of the whole life cycle of building over time. In terms of research team, the research team of Tsinghua University is the largest research team. Based on the analysis of existing research, this paper proposes five future development directions of BIM, which are strengthening management application, promoting intelligent construction, enhancing basic research, promoting technology integration, and innovating teaching mode, respectivly.
[1] |
赖华辉, 邓雪原, 刘西拉.基于IFC标准的BIM数据共享与交换[J].土木工程学报, 2018, 51(4): 121-128. |
[2] |
明星, 周成, 姚毅荣, 邓雪原.基于IDM的建筑工程设计阶段流程图描述方法研究[J].图学学报, 2014, 35(1): 138-144. |
[3] |
何关培.实现BIM价值的三大支柱-IFC/IDM/IFD[J].土木建筑工程信息技术, 2011, 3(1): 108-116. |
[4] |
罗嫦玲, 李珏.基于内容分析法的中、美、英三国BIM标准的研究[J].土木建筑工程信息技术, 2018, 10(6): 21-26. |
[5] | |
[6] |
Liu Chen, Wang Jing.Application of the PKPM-BIM construction management platform in project security management[J].Computer Aided Drafting, Design and Manufacturing, 2017, 27(1): 58-62. |
[7] |
王美华, 高路, 侯羽中, 许晶, 沈伟.国内主流BIM软件特性的应用与比较分析[J].土木建筑工程信息技术, 2017, 9(1): 69-75. |
[8] |
周硕文, 王元丰, 高源林, 罗玮.全面建成小康社会情景下绿色可持续建筑工程发展与挑战研究[J].智库理论与实践, 2019, 4(6): 92-102. |
[9] |
朱记伟, 蒋雅丽, 翟曌, 赵钦.基于知识图谱的国内外BIM领域研究对比[J].土木工程学报, 2018, 51(2): 113-120. |
[10] |
Oraee M, Hosseini M R, Papadonikolaki E, et al. Collaboration in BIM-based construction networks:a bibliometric-qualitative literature review[J]. International Journal of Project Management, 2017, 35(7): 1288-1301. |
[11] |
Zhao, X. A scientometric review of global BIM research:analysis and visualization[J]. Automation in Construction, 80, 37-47. |
[12] |
Yin, X. Liu, H., Chen, Y., & Al-Hussein, M.. Building information modelling for off-site construction:review and future directions[J]. Automation in Construction, 2019, 101, 72-91. |
[13] |
刘照球, 李云贵.建筑信息模型的发展及其在设计中的应用[J].建筑科学, 2009, 25(1): 96-99+108. |
[14] |
刘占省, 王泽强, 张桐睿, 徐瑞龙.BIM技术全寿命周期一体化应用研究[J].施工技术, 2013, 42(18): 91-95. |
[15] | |
[16] | |
[17] |
刘晴, 王建平.基于BIM技术的建设工程生命周期管理研究[J].土木建筑工程信息技术, 2010, 2(3): 40-45. |
[18] |
夏绪勇, 张晓龙, 鲍玲玲, 等.基于BIM的装配式建筑设计软件的研发[J].土木建筑工程信息技术, 2018, 10(2): 40-45. |
[19] |
许杰峰, 鲍玲玲, 马恩成, 等.基于BIM的预制装配建筑体系应用技术[J].土木建筑工程信息技术, 2016, 8(4): 17-20. |
[20] |
黄立新, 马恩成, 张晓龙, 等.PKPM的"BIM数据中心及协同设计平台"[J].建筑科学, 2018, 34(9): 42-49+129. |
[21] | |
[22] | |
[23] |
张云翼, 林佳瑞, 张建平.BIM与云、大数据、物联网等技术的集成应用现状与未来[J].图学学报, 2018, 39(5): 806-816. |
[24] |
张尚, 任宏, Albert P.C.Chan.BIM的工程管理教学改革问题研究(一)-基于美国高校的BIM教育分析[J].建筑经济, 2015, 36(1): 113-116.doi: 10.14181/j.cnki.1002-851x.201501113 |
[25] |
游业刚, 付旭, 李茜, 等.BIM在应用型本科院校中的发展现状及改革思考[J].土木建筑工程信息技术, 2018, 10(2): 68-71. |
Metrics
- PDF Downloads(85)
- Abstract views(3719)
- HTML views(1425)