Citation: Zheng Kaifeng. Application of BIM Data Acquisition in Decoration Construction. Journal of Information Technologyin Civil Engineering and Architecture, 2019, 11(4): 76-82. doi: 10.16670/j.cnki.cn11-5823/tu.2019.04.12
2019, 11(4): 76-82. doi: 10.16670/j.cnki.cn11-5823/tu.2019.04.12
Application of BIM Data Acquisition in Decoration Construction
Shenzhen Asiantime International Construction Co., Ltd., Shenzhen 518017, China |
During the progress of decoration construction process, the BIM model for decoration mainly focuses on the relationship between space, drawings and model data, considering the many factors of complex and diverse decorative shape, huge amount of model information, complicated file organization and collaborative relationship. The BIM application in decoration stage is to develop supporting documentation, to clarify the logical relationship between decoration and other professional building information models, to collate the pre-project information in time, and to collect other professional models and data, which is crucial for the rapid positioning of the decorative model.
[1] |
罗兰, 赵静雅.装饰工程BIM应用流程初探——基于Revit的装饰模型建立和应用流程[J].土木建筑工程信息技术, 2013, 5(6): 81-88. |
[2] |
李占仓, 刘占省, 徐瑞龙.IFC标准在建筑信息模型(BIM)技术中的应用浅析[C].第十二届全国现代结构工程学术研讨会暨第二届全国索结构技术交流会.2012. |
[3] |
罗兰, 王芳.某项目装饰工程基于Revit的BIM技术应用研究[J].土木建筑工程信息技术, 2014, 6(4): 55-61. |
[4] |
百度文库.BIM技术在工程管理中的应用[EB/OL].(2016-07-25)[2018-06-20].https://wenku.baidu.com/view/1aa7be9a7fd5360cba1adbf4.html. |
[5] |
chcnav.三维激光扫描仪在BIM行业中的应用[EB/OL].(2016-08-03)[2018-06-20].http://blog.zhulong.com/u10290003/blogdetail7233814.html. |
[6] |
中国BIM培训网.BIM指导工地现场施工的应用方法[EB/OL].(2016-11-18)[2018-06-20].http://www.sohu.com/a/119337698_242704. |
[7] | |
[8] |
严旭, 范盛颖, 周进.Revit到STAAD.Pro的模型数据转换研究[J].土木建筑工程信息技术, 2017(3): 108-113. |
[9] |
闫文凯, 张国栋.通过BIM平台让数据从设计流动到施工[J].土木建筑工程信息技术, 2015, 7(1): 41-43. |
[10] | |
[11] |
林良帆, 邓雪原.BIM数据存储标准与集成管理研究现状[J].土木建筑工程信息技术, 2013, 5(3): 14-19, 36. |
[12] |
芮小平, 杨崇俊, 王盼成.3维城市模型中的数据获取和组织方案研究[J].地理与地理信息科学, 2002, 18(2): 11-14.doi: 10.3969/j.issn.1672-0504.2002.02.004 |
[13] |
王妃, 宋文涛, 刘支亮.三维激光扫描仪在场馆装饰精度控制中的应用[J].现代测绘, 2016, 39(4): 29-31.doi: 10.3969/j.issn.1672-4097.2016.04.010 |
[14] |
马智亮, 刘世龙, 刘喆.大数据技术及其在土木工程中的应用[J].土木建筑工程信息技术, 2015, 7(5): 45-49. |
[15] |
王勇, 张建平, 胡振中.建筑施工IFC数据描述标准的研究[J].土木建筑工程信息技术, 2011, 3(4): 9-15. |
[16] |
蒋绮琛, 李鑫, 于鑫, 等.面向多源数据库的施工工艺精准创建技术研究[J].土木建筑工程信息技术, 2018, 10(6): 50-54. |
[17] |
杨党辉, 苏原, 孙明.基于Revit的BIM技术结构设计中的数据交换问题分析[J].土木建筑工程信息技术, 2014, 6(3): 13-18. |
Metrics
- PDF Downloads(43)
- Abstract views(2190)
- HTML views(1264)