2011, 3(4): 36-41.
IPD与BIM技术在其中的应用
清华大学土木工程系, 北京 100084 |
IPD and the Adoption of BIM in it
Department of Civil Engineering, Tsinghua University, Beijing 100084, China |
引用本文: 马智亮, 马健坤. IPD与BIM技术在其中的应用[J]. 土木建筑工程信息技术, 2011, 3(4): 36-41.
Citation: Ma Zhiliang, Ma Jiankun. IPD and the Adoption of BIM in it[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2011, 3(4): 36-41.
摘要:IPD(Integrated Project Delivery, 综合项目交付)作为一种全新的工程项目交付模式, 已经在美国、澳大利亚和英国等发达国家得到应用, 并趋于成熟。但是, IPD在我国还没有实际应用案例, 其本身仍然存在着定义模糊、法律合同体系不完善等问题。BIM(Building Information Modeling, 建筑信息模型)技术的出现为推进IPD的发展和完善提供了条件。本文在广泛文献调研的基础上, 首先回顾了IPD的发展历程, 介绍了IPD的定义、特征及其应用的关键—专属工程合同体系并总结了IPD在工程实践中面临的主要问题, 之后归纳了采用BIM技术解决IPD现有问题、提升IPD实施效果的可行途径。本文对在我国利用IPD具有参考作用。
Abstract: As a new method of project delivery, IPD(Integrated Project Delivery) has already been widely used and gradually matured in the practice of several developed countries, e.g.USA, Australia and Britain.However, its application in China is still a blank field.The method itself still has several problems, e.g.the fuzzy definition, the lack of the legal and contract system.The emergence of BIM technology has facilitated the development of IPD.In this paper, based on a thorough literature review, the evolutionary of IPD was reviewed firstly, and then the definition, characteristics and the key point of IPD was summarized, followed by the major problems for the application of IPD in China.Finally, the adoption of BIM in solving current problems and promoting the efficiency of IPD was analyzed.The findings reported in this paper are expected to be beneficial to the application of IPD in China.
[1] |
David C.Kent, Burcin Becerik Gerber.understanding construction industry experience and attitudes toward integrated project delivery[J].Journal of construction engineering and management.2010, 136(8):815-825.doi: 10.1061/(ASCE)CO.1943-7862.0000188 |
[2] |
F.Pena Mora, M.Li.Dynamic Planning and Control Methodology for Design/Build Fast-track Construction Project[J].Journal of Construction Engineering and Management.2001, 127(1):1-17.doi: 10.1061/(ASCE)0733-9364(2001)127:1(1) |
[3] |
The Department of Treasury and Finance. In Pursuit of Additional Value[OL]. (2009. 10)[2011. 5. 28] http://www.dtf.vic.gov.au/CA25713E0002EF43/pages/project-alliancing. |
[4] |
The Construction Management Association of America(CMAA). Managing Integrated Project Delivery[OL]. (2010. 10)[2011. 5. 28]http://cmaanet.org/. |
[5] |
Chris Noble.Can project alliancing agreements change the way we build?[J].Journal of Architectural Record.2007, (7):16-23. |
[6] |
U. S. General Service Administration(GSA). Partnering[OL]. (2010. 10. 20)[2011. 05. 11]http://www.gsa.gov/portal/content/100822. |
[7] |
The Department of Treasury and Finance. Victorian Policy for Alliance Contracting[OL]. (2010. 07)[2011. 05. 11] http://www.dtf.vic.gov.au/CA25713E0002EF43/pages/project-alliancing. |
[8] |
The Associated General Contractors of America(AGC). IPD for Public and Private Owners[OL]. (2010. 01)[2011. 06. 10] http://www.agc.org/. |
[9] |
The Associated General Contractors of America(AGC). Integrated Project Delivery: First Principles for Owners and Teams[OL]. (2007. 07)[2011. 04. 07] http://www.agc.org/. |
[10] |
Amy C. Edmondson, Faaiza Rashid. Integrated Project Delivery at Autodesk, Inc. (C)[J]. Journal of Harvard business school. 2009, (9): 29-37. |
[11] |
The American Institute of Architects(AIA). Integrated Project Delivery: A Guide[OL]. (2007. 9)[2011. 03. 08] http://www.msaipd.com/IPD_Guide_2007.pdf. |
[12] |
The American Institute of Architects(AIA). Integrated Project Delivery(IPD) Family, Contract Documents[OL]. (2010. 08)[2011. 03. 08]http://www.aia.org/index.htm. |
[13] |
Jilei Wang. Integrated Project Delivery-Achieving Relational Contracting through Traditional Project Management Methods[D/OL]. (2008. 07. 14)[2011. 05. 06] http://etd.ohiolink.edu/view.cgi/WANG%20JILEI.pdf?ucin1218820957. |
[14] |
The American Institute of Architects(AIA). AIA C191-2009 Frequently Asked Questions[OL]. (2011. 02. 09)[2011. 05. 08]http://www.aia.org/index.htm. |
[15] |
The Associated General Contractors of America(AGC). ConsensusDOCS 300 Guidebook[OL]. (2011. 07)[2011. 08. 08]http://www.agc.org/. |
[16] |
Kermanshachi.US multi-party standard partnering contract for integrated project delivery[J].Journal of Masters Abstracts International.2010, 48(6):174-185. |
[17] |
U. S. General Service Administration(GSA). 3D-4D Building Information Modeling[OL]. (2011. 03)[2011. 05. 08]http://www.gsa.gov/portal/category/21062. |
[18] |
National Institute of Building Science. National Building Information Modeling Standard[OL]. [2011. 09. 03]http://www.wbdg.org/bim/nbims.php. |
[19] |
Chuck Eastman, Paul Teicholz, Rafael Sacks, Kathleen Liston. BIM Handbook[OL]. [2011. 09. 03] http://books.google.com/books?id=IioygN0nYzMC&hl=zh-CN. |
[20] |
Fish, Amanda. Integrated project delivery the obstacles of implementation[OL]. (2011. 05)[2011. 08. 08]http://krex.k-state.edu/dspace/handle/2097/8554. |
[21] |
The American Institute of Architects(AIA). 2008AIA Documents Advance the Use of BIM and IPD[OL]. (2008. 06)[2011. 05. 08]http://www.aia.org/index.htm. |
[22] |
The Associated General Contractors of America(AGC). Contracts Catalog[OL]. (2011. 07)[2011. 09. 03]http://www.agc.org/. |
[23] |
Nadine M.Leonidas.Integrated-Project-Delivery Boosters Ignore Many Flashing Red Lights[J].Journal of Engineering News-Record(ENR).2010, 264(14):22-24. |
[24] |
Reza Ghassemi.Transitioning to Integrated Project Delivery-Potential barriers and lessons learned[J].Journal of Lean Construction Journal.2011, (1):32-52. |
[25] |
Islam.H.El-adaway.Integrated Project Delivery Case Study Guidelines for Drafting Partnering Contract[J].Journal of Legal Affairs and Dispute Resolution in Engineering and Construction.2010, 2(4):248-254.doi: 10.1061/(ASCE)LA.1943-4170.0000024 |
[26] |
Stephen A.Hilger.The Legal Worries Raised by IPD[J].Journal of Engineering News-Record(ENR).2010, 264(30):12-19. |
[27] |
Pardis B. Pishdad. Integrating Multi-Party Contracting Risk Management(MPCRM) Model with Building Information Modeling(BIM)[OL]. (2010. 08)[2011. 08. 08]http://itc.scix.net/data/works/att/w78-2010-44.pdf. |
[28] |
Leentje Volker.architect participation in integrated project delivery-the future mainspring of architectural design firms[J].Journal of Gest?o & Tecnologia de Projetos.2010, 5(3):22-37. |
[29] |
W. Nofera, S. Korkmaz., V. Miller. Innovative Features of Integrated Project Delivery Shaping Project Team Communication. Proceedings of Engineering Project Organizations Conference, Estes Park[C]. USA 2010. |
[30] |
The American Institute of Architects(AIA). Crossing the IPD Chasm with BIM[OL]. (2010. 10)[2011. 05. 08]http://www.aia.org/index.htm. |
[31] |
Franklin D. Lancaster. Integrated Project Delivery-Next-Generation BIM for Structural Engineering. Proceedings of 2010 Structures Congress?2010 ASCE, Washington, DC[C]. USA 2010. |
[32] |
The Department of Treasury and Finance. The Practitioners' Guide to Alliance Contracting[OL]. (2010. 10. 25)[2011. 05. 08] http://www.dtf.vic.gov.au/CA25713E0002EF43/pages/project-alliancing. |
[33] |
Ryan E.Smith.Lean and Integrated Project Delivery[J].Journal of Lean Construction.2011, (1):1-16. |
[34] |
Howard Mckew.INTEGRATED-Project Delivery.[J] Journal of Engineered Systems.2009, 26(1):108-118. |
[35] |
Guangbin Wang. Cooperation between Building Information Modeling and Integrated Project Delivery Method Leads to Paradigm Shift of AEC Industry. Proceedings of the 2009 International Conference on Management and Service Science(MASS)[C]. USA 2009. |
计量
- PDF下载量(15)
- 文章访问量(1589)
- HTML全文浏览量(1250)