Citation: Chang Qian. Staff and Project Coordination in BIM Application. Journal of Information Technologyin Civil Engineering and Architecture, 2012, 4(4): 43-46.
2012, 4(4): 43-46.
Staff and Project Coordination in BIM Application
Walton Design & Consulting Engineering Co., LTD., Beijing 100034, China |
Many architectural design firms started to apply and spread the new technology when BIM is acquired in all the attentions.It has become the key point that reasonable staff coordination since design is developed from 2D to 3D.
[1] | |
[2] |
应宇垦, 王婷.探讨BIM应用对工程项目组织流程的影响[J].土木建筑工程信息技术, 2012, 4(2):52-55. |
[3] |
建立企业级BIM生产力需要哪些BIM专业应用人才[J]. 土木建筑工程信息技术, 2012, 4(1): 57-60. |
Metrics
- PDF Downloads(13)
- Abstract views(968)
- HTML views(678)