• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Citation: Zhong Wei, Zhang Kaile, Nie Fengya. Research on BIM-5D Fine Management in Hainan Hotel Project. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(2): 24-29. doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.04

2017, 9(2): 24-29. doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.04

Research on BIM-5D Fine Management in Hainan Hotel Project

1. 

School of Management, Tianjin University of Technology, Tianjin 300384, China

2. 

Tianjin Company, China Construction 8th Engineering Division, Tianjin 300384, China

Web Publishing Date: 2017-04-01

Fund Project: 国家社科基金项目“政府主导实施BIM情境下公建项目多利益方协同与反腐治理研究”(项目编号:15BGL173);天津市科技重大专项与工程项目“天津市BIM共享服务信息平台技术研究”(项目编号:15ZXHLSF00040)国家社科基金项目“政府主导实施BIM情境下公建项目多利益方协同与反腐治理研究” 项目编号:15BGL173天津市科技重大专项与工程项目“天津市BIM共享服务信息平台技术研究” 项目编号:15ZXHLSF00040

[1]

李红兵, 李蕾.工程项目环境下的知识管理方法研究[J].科技进步与对策, 2004, 21(5): 14-16. 

[2]

张云云. M公司项目管理流程优化研究[D]. 哈尔滨: 哈尔滨工业大学, 2016.

[3]

张建平.BIM技术的研究与应用[J].施工技术, 2011(1): 15-18. 

[4]

薛刚.BIM-5D在大型机电安装工程中的应用研究[J].建筑科学, 2016, 32(12): 54-59. 

[5]

唐海燕, 刘荣桂等.基于BIM-5D的工程施工成本预测系统构建[J].工程管理学报, 2015, 29(4): 107-112. 

Metrics
  • PDF Downloads(38)
  • Abstract views(2196)
  • HTML views(766)
Catalog

Figures And Tables

Research on BIM-5D Fine Management in Hainan Hotel Project

Zhong Wei, Zhang Kaile, Nie Fengya

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn