Citation: Li Yayong, Zhou Xueyong, Chen Shengkai, Yang Peicheng, Wang Peng, Liao Xiaofeng, Yang qiang. BIM Application on Construction Phase of Lijia Jialingjiang River Bridge. Journal of Information Technologyin Civil Engineering and Architecture, 2020, 12(4): 62-69. doi: 10.16670/j.cnki.cn11-5823/tu.2020.04.08
2020, 12(4): 62-69. doi: 10.16670/j.cnki.cn11-5823/tu.2020.04.08
BIM Application on Construction Phase of Lijia Jialingjiang River Bridge
1. | China Construction Tunnel Co., Ltd., Chongqing 401320, China |
2. | Chongqing Zhuyun Technology Corp., Ltd., Chongqing 401121, China |
Lijia Jialing River Bridge is the first beam camber deck bridge in China, which has the novelty in structural design, the complexity in construction and the complication in geological environment. During the construction process, high level BIM model (LOD 400) is developed. BIM technologies have been implemented, for example, integrated analysis, 3D clash detection and visualization helps the review and delivery process to improve the constructability of the bridge. BIM collaborative management platform can be established through integrating BIM, Project Management (PM) and integrated implementation of Internet of Things (IoT). It can uses the mobile terminal and IoT to enable live-time data collection, thus to achieve the collaborative operation between PC and mobile terminal to process the management in schedule, quality and safety, therefore, the performance of Lean Management can be improved. Artificial Intelligence (AI) smart image recognition system based on video streaming has been developed independently to enable the automatic detection of the person if wears helmet and safety vest, thus provides a strong construction supervision in safeties. It has effectively promoted the experience of practical BIM technologies through the exploration and the implementation of BIM technologies in bridge engineering.
Metrics
- PDF Downloads(28)
- Abstract views(2244)
- HTML views(827)