Citation: Chen Menglong, Zhang Jianqi. Study on Extra Earning by Unbalanced Bid based on Engineering Change. Journal of Information Technologyin Civil Engineering and Architecture, 2013, 5(2): 31-36.
2013, 5(2): 31-36.
Study on Extra Earning by Unbalanced Bid based on Engineering Change
1. | School of Management, Chongqing Jiaotong University, Chongqing 400060, China |
2. | CABR Technology Co., Ltd., Beijing 100013, China |
This paper analyses the mechanism of extra earning by which the contractors make unbalance bid by utilizing engineering change, reaches two key nodes, and describes the process of engineering change with the help of the idea of triggering.On the basis of these, it constructs a FSD model which contains the forecast of engineering change, the simulation of the appearance of the expected engineering change and the design of the Bidding strategy.This model can be used as theoretical basic and provide contractors a standardized operation process of unbalanced bid.
[1] |
杜亚灵, 尹贻林.不完全契约视角下的工程项目风险分担框架研究[J].重庆大学学报(社会科学版), 2012, 18(1):65-70. |
[2] |
李建峰, 熊清源, 罗建国, 张英.不平衡报价策略与防范对策的探讨[J].建筑技术, 2005, 36(7):539-541. |
[3] |
宋志勇.不平衡报价的量化识别与博弈研究[J].西安建筑科技大学学报(自然科学版), 2012, 44(1):109-113. |
[4] |
尹贻林, 乔璐, 李彪.基于不平衡报价的承包商创收策略解析[J].沈阳建筑大学学报(社会科学版), 2011, 13(1):40-43. |
[5] | |
[6] |
周和生, 尹贻林.建设项目全过程造价管理[M].天津:天津大学出版社, 2010:158-209. |
[7] |
宋吉荣. 工程量清单计价模式下招投标理论与方法研究[D]. 四川: 西南交通大学管理学院, 2007. |
[8] |
孟新田.清单计价下的不平衡报价控制模式研究[J].建筑经济, 2006(7):50-52.[9]韩春民, 刘素华, 解汉瑞.建设单位在工程项目中的变更管理[J].建筑经济, 2007(2):79-81. |
[9] | |
[10] |
王玉红, 黄开枝, 赵华.时间表映射的LGD链路触发网络切换机制[J].计算机工程与应用, 2010, 46(17):88-91.doi: 10.3778/j.issn.1002-8331.2010.17.025 |
[11] | |
[12] |
Metrics
- PDF Downloads(11)
- Abstract views(1186)
- HTML views(733)