Citation: Yong Shi, Honghao Wang, Yi Cai. Comprehensive Measurement Technology of Large Span Steel Structure. Journal of Information Technologyin Civil Engineering and Architecture, 2022, 14(3): 124-130. doi: 10.16670/j.cnki.cn11-5823/tu.2022.03.18
2022, 14(3): 124-130. doi: 10.16670/j.cnki.cn11-5823/tu.2022.03.18
Comprehensive Measurement Technology of Large Span Steel Structure
China State Construction Second Engineering Bureau Co., Ltd., Hefei 230000, China |
Taking the example of Comprehensive Hall and Standard Hall of Hefei Lakeside International Convention and Exhibition Center, the objective of this paper is to establish the first level control network in the field, the ground vertical assembling survey, the ground horizontal assembling survey, the high-altitude support assembling tire rack survey, the unloading survey, the whole hoisting survey and the high-quality completing survey task, and the construction survey technology of large Span Truss, inverted triangle wind column and Arc Cantilever for large exhibition hall is discussed. It can be used as reference in sliding construction or whole lifting construction of similar large-span high-altitude steel structure.
[1] | |
[2] |
程明龙. 钢结构施工管理要点探析[J]. 江西建材, 2018(3): 220+223.doi: 10.3969/j.issn.1006-2890.2018.03.166 |
[3] |
赵秋华, 董根德, 刘春. 石家庄机场T2航站楼钢结构施工技术[J]. 钢结构, 2012, 27(2): 58-63.doi: 10.3969/j.issn.1007-9963.2012.02.014 |
[4] |
李建军. 土木工程钢结构施工技术的有关问题初探[J]. 建材与装饰, 2018(3): 8.doi: 10.3969/j.issn.1673-0038.2018.03.007 |
[5] |
陈浩. 建筑钢结构施工技术与质量控制的措施分析[J]. 建材与装饰, 2018(3): 57.doi: 10.3969/j.issn.1673-0038.2018.03.050 |
[6] |
李籍, 邢惟妍, 禹浩. 分段塔架卧式拼装时锥体结构精度控制[J]. 石油工程建设. 2020, 46(1): 4-5. |
[7] | |
[8] | |
[9] |
黄恒, 刘国栋, 冉东. 基于MS60的BIM施工放样精度研究[J]. 重庆建筑. 2018, 178(8): 36-39. |
[10] |
Metrics
- PDF Downloads(28)
- Abstract views(1311)
- HTML views(947)