Citation: Han Yandong, Ren Jixing, Wang Zhihe, Li Yan. The BLC Innovative Integrated Design of Jilin Jianzhu University Museum of Urban Architecture. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(2): 60-66. doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.10
2017, 9(2): 60-66. doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.10
The BLC Innovative Integrated Design of Jilin Jianzhu University Museum of Urban Architecture
Project Management(MBF Direction)Double Bachelor′s Degree, Jilin Jianzhu University, Jilin 130000, China |
All MBF student groups should work together for a BLC innovative integrated design for the Jilin Jianzhu University Museum of Urban Architecture. The purpose of this study is to explore how Building Information Modelling (BIM) will improve the existing out-dated production relationship. Advanced production relationship and production tools are integrated innovatively to transfer traditional design process and construction management method, to realize intensive project management, also to satisfy all project stakeholders, and to achieve a final success of the project. PMBOK is used as the guideline during the life cycle of the project, and the Pre-FM enables the owner to collect requirements and monitor the project progress. Through deliberate discussion with the design and construction companies, the owner decides to use BIM, and apply IPD contract, to coordinate the relationship between project units and to implement project integration delivery. The parametric results of BIM collaborative design are delivered to contractor for further processing in order to guide the project construction. The Post-FM accepts the as-built model, which is used in the later stage of operation & maintenance management, to achieve a life-cycle application for the project.
Metrics
- PDF Downloads(21)
- Abstract views(2198)
- HTML views(1054)