Citation: Wang Zhongcheng, Wang Lei, Zhang Qiao. Application of Mechanical and Electrical Comprehensive Pipeline Arrangement of Subway Station based on BIM. Journal of Information Technologyin Civil Engineering and Architecture, 2016, 8(3): 66-73. doi: 10.16670/j.cnki.cn11-5823/tu.2016.03.13

2016, 8(3): 66-73. doi: 10.16670/j.cnki.cn11-5823/tu.2016.03.13

Application of Mechanical and Electrical Comprehensive Pipeline Arrangement of Subway Station based on BIM

1. 

Guang Dong Zhong Gong Project Management Co., Ltd., Guangzhou 510670, China

2. 

China Railway Eleven Bureau Group Co., Ltd., Wuhan 430061, China

Web Publishing Date: 2016-06-01

[1]

纪凡荣, 徐友全, 曾大林等. BIM技术在某项目管线综合中的应用[J].施工技术, 2013, 42(3): 107-109.doi: 10.7672/sgjs2013040107

[2]

张建平. BIM技术的研究与应用[J].施工技术, 2011, 40(2). 

[3]

李峰, 林胜强, 蒙乃钢, 杨华. BIM技术在商业综合体官网中的应用[J].施工技术, 2015, 44(6): 780-784. 

[4]

王君峰. Autodesk Navisworks实战应用思维课堂[M].北京:机械工业出版社2015: 125-148.

[5]

清华大学BIM课题组, 上安集团BIM课题组.机电安装企业BIM实施标准指南[M].北京:中国建筑工业出版社2015: 52-70.

Metrics
  • PDF Downloads(28)
  • Abstract views(2724)
  • HTML views(1007)
Catalog

Figures And Tables

Application of Mechanical and Electrical Comprehensive Pipeline Arrangement of Subway Station based on BIM

Wang Zhongcheng, Wang Lei, Zhang Qiao

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn