Citation: Yu Zhixian, Huang Lijuan, Xia Lei, Ji Feng. BIM Application of Owner on the Project of Hefei Tianlong Plaza. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(2): 36-40. doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.06
2017, 9(2): 36-40. doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.06
BIM Application of Owner on the Project of Hefei Tianlong Plaza
1. | JIANGSU Design of Century Architecture Co., Ltd., Changzhou 213000, China |
2. | Shanghai Binfo Construction Engineering Consulting Co., Ltd., Shanghai 200000, China |
With the application technology of building information model(BIM)technology more and more extensive, and the owner′s application of BIM technology more and more in-depth, the value of BIM in the design, cost, construction and other stages of is also increasing.This paper focuses on the BIM application in the project of Hefei Tianlong Plaza.The BIM application met the owner′s requirements, formulated the scheme of BIM application, cleared the key points in the application of BIM.Through BIM practice, owners managed and controled the project in the design, cost and construction phase, ensured the implementation of the project, and obtained certain value and effect.Finally, owners could form the BIM application standards in accordance with their own requirements.
[1] |
吕丽涛.基于BIM的全过程工程造价控制研究[J].建筑工程技术与设计, 2014, (22): 172.doi: 10.3969/j.issn.2095-6630.2014.22.169 |
[2] |
Eastman C, Teicholz P, Sacks R.BIM handbook:a guide to building information modeling for owners, managers, designers, engineers and contractors[M].New York:John Wiley and Sons, 2008: 31-35. |
[3] | |
[4] |
张洋. 基于BIM的建筑工程信息集成与管理研究[D]. 上海: 清华大学, 2009. |
[5] |
Metrics
- PDF Downloads(29)
- Abstract views(1942)
- HTML views(753)