2013, 5(4): 99-102,110.
地铁机电安装工程中的总承包管理探讨
中建五局第三建设有限公司, 长沙 410000 |
The Research of General Contract Management in Subway Mechanical and Electrical Installation Engineering
The Third Buildings CO., Ltd., Of China Construction Fifth Engineering Bureau, Changsha 410000, China |
引用本文: 谭武, 傅小波. 地铁机电安装工程中的总承包管理探讨[J]. 土木建筑工程信息技术, 2013, 5(4): 99-102,110.
Citation: Tan Wu, Fu Xiaobo. The Research of General Contract Management in Subway Mechanical and Electrical Installation Engineering[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2013, 5(4): 99-102,110.
摘要:本文通过重庆轻轨一号线沙大段机电安装总承包项目实践,探讨了地铁机电安装工程的“四多”特点,论述了机电总承包方在各专业承包商接口与施工界面管理、施工顺序管理、联合施工计划管理、材料设备及大型设备运输管理、施工质量管理、施工安全管理和合约管理等几大管理要素的内容、方法、要点。
Abstract: Through mechanical and electrical installation general contract management practice of Chongqing light rail of the Sha Daduan projects, this paper has explored the mechanical and electrical installation works of the subway.For "more than four" features, the major content management elements, methods and points which contains construction management between general contractor and subcontrator, construction sequence management, joint construction project management, materials and large equipment transportation management, construction quality management, construction safety management and contract administration has analysised.
[1] |
GB 50157-2003地铁设计规范[S]. |
[2] |
GB 50299-1999地下铁道工程施工及验收规范(2003年版)[S]. |
[3] |
张振森.城市轨道交通运输[M].北京:中国铁道出版社, 2002. |
[4] |
王运峰.地铁机电安装工程的施工协调管理[J].城市轨道交通研究.2012(05):22-25. |
[5] | |
[6] | |
[7] | |
[8] |
刘永谦.综合交通枢纽建设和运营管理模式的研究[J]:城市轨道交通研究, 2012(02):1-3.doi: 10.3969/j.issn.1007-869X.2012.02.001 |
[9] | |
[10] |
丁少昆.天津站枢纽换乘中心通风空调系统方案及管理模式[J]:城市轨道交通研究, 2012(05):18-19.doi: 10.3969/j.issn.1007-869X.2012.05.006 |
计量
- PDF下载量(16)
- 文章访问量(1102)
- HTML全文浏览量(997)