Citation: Xiying Cui, Ye Feng, Bo Li, Yichuan Deng, Jiaxin Jiang, Guangzheng Shang, Junwu Liao. Application and Analysis of BIM-Based Simulation of Pile Length in Quantity. Journal of Information Technologyin Civil Engineering and Architecture, 2023, 15(1): 77-82. doi: 10.16670/j.cnki.cn11-5823/tu.2023.01.14
2023, 15(1): 77-82. doi: 10.16670/j.cnki.cn11-5823/tu.2023.01.14
Application and Analysis of BIM-Based Simulation of Pile Length in Quantity
1. | China Construction Eighth Engineering Division Co., Ltd., Guangzhou 510663, China |
2. | South China University of Technology, Guangzhou 510641, China |
3. | Geological & Geophysical Engineering Exploration Institute of Guangdong province, Guangzhou 510800, China |
In pile foundation engineering, the length of end bearing pile is determined by the depth of bearing layer. In order to make the work of material preparation and program scheduling, etc., more accurately, the acquisition of this depth has become a major focus in pile foundation projects.. In traditional way, geological prospecting column chart combined with planar graph is generally used to estimate through complicated manpower calculation. With the development of BIM technology, a large number of BIM based prediction methods have emerged in recent years. In this context, this paper proposes a method about predicting the pile length in quantity. Compared with the existing methods, it is more efficient and needs less manual operation, and its accuracy has been verified in practice.
Metrics
- PDF Downloads(42)
- Abstract views(1710)
- HTML views(1092)