Citation: He Bo. Methods of Manage the Large Project BIM Model. Journal of Information Technologyin Civil Engineering and Architecture, 2012, 4(4): 7-14.
2012, 4(4): 7-14.
Methods of Manage the Large Project BIM Model
BIM Center, Huazhong University of Science and Technology, Wuhan 430074, China |
Ubiquitos Technology Co., Ltd., Guang zhou 510640, China |
Large project BIM model amount is large, which require rigorous and effective management methods, to ensure that the BIM model satisfies architects, structure engineers, MEP engineers can work together everything in good order and well arranged, and follow the standards and rules to ensure that the model accuracy can meet the application requirement of the project, while minimizing the cost. Apart from the traditional review process, also should use software tools to check the BIM model, in order to ensure the quality of models and adopt corresponding measures to ensure data security.
[1] |
何关培新浪博客, http://blog.sina.com.cn/heguanpei. |
[2] |
何关培主编: 《BIM总论》. |
[3] |
Chuck Eastman, Paul Teicholz, Rafael Sacks, Kathleen Liston:《BIM Handbook》. |
[4] |
Los Angeles Community College District:《Building Information Modeling Standards》. |
[5] |
Hong Kong Housing Authority:《Building Information Modelling (BIM)Standards Manual》. |
Metrics
- PDF Downloads(16)
- Abstract views(1109)
- HTML views(677)