Citation: Qiu Yanhang. Application of ANN in Aluminum Formwork Construction. Journal of Information Technologyin Civil Engineering and Architecture, 2018, 10(3): 116-118. doi: 10.16670/j.cnki.cn11-5823/tu.2018.03.22

2018, 10(3): 116-118. doi: 10.16670/j.cnki.cn11-5823/tu.2018.03.22

Application of ANN in Aluminum Formwork Construction

Shenzhen Institute, China Academy of Building Research, Shenzhen 518057, China

Web Publishing Date: 2018-06-01

Fund Project: 中国建筑科学研究院应用技术研究课题“基于BIM技术的铝模板施工智能设计软件研究与开发“ 20160120330730035

[1]

Rossini F L, Novembri G, Fioravanti, A. AS&BIM-A Unified Model of Agent Swarm and BIM to Manage the Complexity of the Building Process, CAAD Futures 2017, 321-332. (2017).

[2]

Rossini F L, Novembri G, Fioravanti A. BIm and Agent-based Model Integration for Construction Management Optimization"in: LC3 2017 Volume Ⅱ-Proceedings of the 25th Annual Conference of the International Group for Lean Construction(IGLC), 111-118.

[3]

Modi, P J, Shen, W M, Tambe M, et al. An asynchronous complete method for distributed constraint optimization. In proceedings of the 2nd AAMAS, Autonomous Agents and Multi-Agents Systems, 161-168(2003).

[4]

Freuder, E C, Mackworth A K. Constraint Satisfaction: an emerging paradigm, in Handbook of constraint programming, Chapter 2, Rossi, F, Van Beek, P, Walsh, T, eds, Elsevier(2008).

[5]

Mirahadi F, Zayed T. Simulation-based construction productivity forecast using NeuralNetwork-Driven Fuzzy Reasoning, in Automation in Construction, 65, 102-115(2016).

[6]

PMI(Project Management Institute)PMBOK. A guide to the Project Management Body ofKnowledge, V edition, PMI Editor(2013).

[7]

Andrei A. Rusu, Neil C. Rabinowitz, Guillaume Desjardins, Hubert Soyer, James Kirkpatrick, Koray Kavukcuoglu, Razvan Pascanu, Raia Hadsell: Progressive Neural Networks, arXiv: 1606. 04671v115 Jun 2016.

[8]

Chena S M, Griffis FH, Chen, P H, et al. A framework for an automated andintegrated project scheduling and management system, in Automation in Construction, 35: 89-110(2013).

[9]

Taillandier F, Taillandier P, Tepeli E, et al. Amulti-agent model to manage risks in construction project(SMACC)in Automation inConstruction, 58, 1-18(2015).

Metrics
  • PDF Downloads(35)
  • Abstract views(2425)
  • HTML views(939)
Catalog

Figures And Tables

Application of ANN in Aluminum Formwork Construction

Qiu Yanhang

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn