Citation: Chen Jun. Whole Life-Cycle BIM Application in Shanghai EXPO Museum. Journal of Information Technologyin Civil Engineering and Architecture, 2017, 9(2): 8-15. doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.02
2017, 9(2): 8-15. doi: 10.16670/j.cnki.cn11-5823/tu.2017.02.02
Whole Life-Cycle BIM Application in Shanghai EXPO Museum
Shanghai EXPO Construction & Development Co., Ltd., Shanghai 200125, China |
Shanghai EXPO museum is the first BIM pilot project financially invested by Shanghai government. Start with the "Cloud of celebration", this paper mainly introduces the application of BIM technology in Shanghai EXPO museum in design stage, construction stage and operational stage, as well as how to manage the models, drawings, documents and workflows in the whole life-cycle process through the collaborative platform. Application of the BIM technology has increased the capacity of project management effectively, and solved the problems at the design stage and construction stage of 'Cloud of celebration' at the same.
[1] |
Chuck Eastman, Paul Teicholz, Rafael Sacks, Kathleen Liston, BIM Handbook:A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors(Second Edition), Apr 19th, 2011. |
[2] |
Zhiliang Ma, Jiankun Ma, Formulating the Application Functional Requirements of a BIM-based Collaboration Platform to Support IPD Projects, 2016. |
[3] |
Kathy O. Roper CFM LEED AP, Richard P. Payant CFM CPE The Facility Management Handbook, July 30th, 2014. |
Metrics
- PDF Downloads(28)
- Abstract views(2155)
- HTML views(780)