Comprehensive Application of BIM Technology in Beijing Zhongguancun Technology Park-Fengtai Innovation Center
Hu Yi, Kang Zhihong, Cao Le, Wang Que, Zhang Kai, Hao Xuechao, Wang Hao, Yan Wen
2019,11(4):7-12. doi: 10.16670/j.cnki.cn11-5823/tu.2019.04.02
Beijing Zhongguancun Technology Park-Fengtai Innovation Center Project is a high-rise building integrating government office and international business, with a total construction area of 580000 square meters.It has the huge engineering volume, the long construction period and the complex scale of electromechanical pipelines.The complicated construction of curtain wall and landscape is also the feature and difficulty of this project.BIM technology for this project covers the entire life cycle of the building from pre-design, construction to post-operation stage.The main application points of BIM technology are including collaborative management platform, 3D drawing review, electromechanical integrated, construction simulation and the VR application for the key area of hardbound model to insure the successful implementation of the project.In addition, these applications can shorten the construction period, reduce costs, and create a quality building.
key words: BIM, Collaboration Management Platform, Pipeline Layout, Technology Application, VR
BIM Opens the New Future of Civil Aviation Construction——BIM Application in BOAO Airport
Xiao Jing, Cao Le, Mo Dai, Fu Wuwen, Zhang Wen, Dong Litao, Hao Xuechao, Zhang Kai
2016,8(5):1-9. doi: 10.16670/j.cnki.cn11-5823/tu.2016.05.01
As the key supporting project of BOAO Forum for Asia 2016, BOAO Airport was built in 10 months. The construction speed was double of the domestic similar projects. Considering the short period and the high orientation, the project used BIM technology to obtain high quality and performance, applied data reference for the airport construction under BIM times.
key words: BOAO Airport, BIM, Detailed Scheme, Path Roaming, Airport Management
Comprehensive Application of BIM Technology in Songzhuang Cultural Center Project Design Stage
Wang Que, Cao Le, Lu Xiangyi, Hao Xuechao, Zhang Kai, Liu Lu, Liu Kunpeng, Cao Sheng, Tang Kaichun
2020,12(6):103-108. doi: 10.16670/j.cnki.cn11-5823/tu.2020.06.17
In recent years, BIM technology, as an increasingly sophisticated technical solutions and management tool, has received more and more attentions in engineering design in China. By building a BIM collaborative management platform, this paper outlines the comprehensive application of BIM technology during the design stage of SongZhuang Town 0301-1201 plot F3 other multi-functional land project, which not only saves time and economic costs, but also trained a large number of BIM personnel for the future. This engineering construction project has provided valuable success experience.
key words: Building Information Modeling (BIM), Design Stage, Pipeline Synthesis, BIM Collaboration Platform
Summary of the Patent Technology of BIM
Yao Wenjing, Huo Guanghui, Zhang Kai, Hao Xuechao
2018,10(4):95-99. doi: 10.16670/j.cnki.cn11-5823/tu.2018.04.15
This paper analyzes the patent application status in the field of BIM, including the trend of patent application, the distribution of applicant types, the technical distribution and development of major applicants, by means of collecting, indexing and carding the patent documentsin the field of BIM. According to the technical branch of the BIM patent application that is summarized and analyzed, such as system integration, model optimization, construction management optimization, construction scheme optimization, system development and so on, the patent technology development of several representative applicantsis reviewed and analyzed.
key words: BIM, Patent Application, Number of Application, Applicant, Technology Distribution, Technology Development
BIM Technology Applied in Gui'an Comprehensive Bonded Zoneto Guide Large Formwork
Hao Xuechao, Cao Le, Fang Ligang, Huang Xiaobin, Wang Yuhao, Qi Nannan
2015,7(5):35-38. doi: 10.16670/j.cnki.cn11-5823/tu.2015.05.06
Gui'an bonded area in Guizhou province is the second integrated free trade zone. The planning area is 2.2 km2, with an seine area of 2.1 km2. This project is a comprehensive service building in the free trade zone. BIM technology was carried out when the project started. This paper mainly introduces the application of BIM technology in the high support of the composite service building to solve the problems encountered in the implementation and demonstration of the original support scheme and to ensure the smooth, safe and punctual completion of the tall formwork for the entire project.
key words: BIM, High Large Formwork, Program Simulation, Safety, Animation Display

Year of publication

Related authors

Related hot words

  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn