BIM技术在项目进度管控中的应用
中建八局第三建设有限公司,南京 200046 |
Application of BIM Technology in Schedule Management of Project
The Third Construction Co., Ltd., of China Construction Eighth Engineering Devision, Nanjing 210046, China |
引用本文: 樊军, 王璟. BIM技术在项目进度管控中的应用[J]. 土木建筑工程信息技术, 2019, 11(6): 66-69. doi: 10.16670/j.cnki.cn11-5823/tu.2019.06.10
Citation: Fan Jun, Wang Jing. Application of BIM Technology in Schedule Management of Project[J]. Journal of Information Technologyin Civil Engineering and Architecture, 2019, 11(6): 66-69. doi: 10.16670/j.cnki.cn11-5823/tu.2019.06.10
摘要:项目进度管控是项目管理中的关键内容,工程实践的经验表明,施工进度的合理安排[
Abstract: The schedule management is one key point in the management of project. Practice experiences of engineering have proven that reasonable arrangement of construction schedule will directly result in the insurance of on-time delivery, good quality and lower costs, which is a decisive factor affecting the overall economic and social benefits of a project. With the emergence and development of BIM technology, the application of BIM will significantly improve the level of project management. Hence, the introduction of BIM technology into the schedule management will certainly improve the effect of schedule management in a project.