• ISSN: 1674-7461
  • CN: 11-5823/TU
  • Hosted by: China Society and Technology Association
  • Organizer: China Graphics Society
  • Guidance: China Academy of Building Research

Submit Online

Search

Search Journal

Search Keywords

Vol. 8, No 1, 2016

Display mode :        |     

Research on Engineering Cost Control based on BIM Technology
Yan Wenkai, Liu Jiyu, Zhang Yidan
2016, 8(1): 1-6. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.01
[Abstract](2362) [FullText HTML] (802) [PDF 3035KB](36)
Abstract:
At present, based on 2D drawings, the project budget usually gets final data through model reconstruction, summary and calculation.The project budget often begins from the stage of drawings and engineering design decisions often ignore the economic rationality.This article aims to find out the mode to connect BIM model with the common cost software, to realize that designers can participate in cost control, to eliminate the work of building model for engineering cost calculation, to improve work efficiency, and meanwhile to explore the rich information of BIM model.
Green Campus Construction Evaluation System
Xin Hongyan, Luo Xianrui, Zhong Hua
2016, 8(1): 7-13. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.02
[Abstract](2305) [FullText HTML] (1263) [PDF 3538KB](19)
Abstract:
Campus is an important part of the society, as well as an important cradle and base for teaching and providing support for the development of the nation.In order to promote the sustainable development of society.cam. pus as a driving force is used to improve the efficiency of resource utilization and to alleviate the energy shortage and environmental pollution problems.Campus, as a part of public infrastructure.has such common characteristics as diversitied building functions, dense population and large energy consumption.The pollution load and energy consump. tion are very considerable.Green campus construction has drawn wide public atlention, and this paper systematicallv discusses green campus evaluation index and evaluation system by comparing the index at home and abroad.According to Green Campus Evaluation Standard, it puts forward the evaluation index system of green campus construction applicable to the computer technology platform.And on this basis, it completes the frame design and construction of the green campus evaluation system, discusses each sub-system functions of green campus evaluation system.
2016, 8(1): 14-14.
[Abstract](817) [FullText HTML] (752) [PDF 507KB](16)
Abstract:
Application of BIM Technology in Hyperbolic Concrete Shell Roof Construction
Huang Zonggui, Zhang Mingliang, Zhou Jin, Li Sai, Li Penghui, Yang Chao
2016, 8(1): 15-21. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.03
[Abstract](1980) [FullText HTML] (1220) [PDF 3533KB](24)
Abstract:
BIM technology used by Longping Rice Museum construction process plays a very good guiding role in the construction site layout, hyperbolic shell concrete roof formwork, quantity statistics and construction survey. At the same time, the use of iBan mobile application technology realizes project management in a wider range and in a quicker and more transparent and efficient way.Through the application of BIM technology, the construction period is shortened, the cost is saved, and better social and economic benefits are obtained.
Subway Segment Production Management System Design based on 2D Barcode Technology
Song Bozhou, Xiong Cheng, Xia Haibing
2016, 8(1): 22-28. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.04
[Abstract](2430) [FullText HTML] (822) [PDF 3537KB](18)
Abstract:
Currently, in segment production plants factory, management and quality monitoring information is usually recorded with notebook in the workshop, including the number of production, inventory stock number, material quantity and quality monitoring information.Data are not typed into the computer until back to the office.Furthermore, during production, storage and transportation, there are problems like access to information, data re-entry, tracking, delivery delay and errors, resulting in a waste of labor and raw materials costs.2D barcode is a promising technology that can be effectively used for data collection and viewing during stacking and transportation.Currently, RFID technology has achieved a lot of research fruits, but meanwhile encountered many problems in practical ap. plications, and as a result, it can't realize large-scale promotion in the segment production.This paper studies tested two-dimensional code and proposes segment production management system based on two-dimensional code technology.
Research on Foundation Pit Dewatering of Wuhan Subway Station during Excavation
Liao Lizhao, Zhou Xiangyu, Liu Baolin, Zhou Ying
2016, 8(1): 29-35. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.05
[Abstract](2292) [FullText HTML] (1193) [PDF 3534KB](16)
Abstract:
The foundation pit dewatering of subway station during excavation is an important part of the work progress.However, the job location of the subway station is generally located in the region of high population flow, and the foundation pit dewatering always brings some bad influence on the surroundings.So the foundation pit dewatering should be studied and analyzed.Based on a metro station of Line No.6 of Wuhan Metro, this paper explains the change law of surrounding building settlement and deformation of retaining structures by using the practical nonitoring data during the process of foundation pit dewatering.Main conclusions are as below:1) in terms of the influence of surrounding buildings, the effect of external foundation pit dewatering is much bigger than that of internal foundation pit dewatering; 2) the effect of external foundation pit dewatering can reduce the active earth pressure of the foundation pit lateral in some degree, and then reduce deformation of retaining structures; 3) the soil property and condition of foundation pit dewatering would have a great impact on the deformation of retaining structures.
2016, 8(1): 36-37.
[Abstract](816) [FullText HTML] (660) [PDF 1011KB](15)
Abstract:
Development and Application of Three-Dimensional Display Technology of Revit
Jia Yingping, Li Chunxiang
2016, 8(1): 38-42. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.06
[Abstract](2162) [FullText HTML] (1257) [PDF 2527KB](24)
Abstract:
Visualization of building models is an important way for digital modeling technologies to realize information exchanges and sharing among different specialties, while direct, efficient and accurate model display is a powerful guarantee for the successful completion of the projects.At present, Revit realizes the 3D region model by the function of "section box".But this function is affected by the size of the model and the limit of the configura-tion.In practical application process.we need to rotate the model view and stretch the boundaries of the section box repeatedly, which is inefficient.Based on those, the key points of the application of Revit model visualization technology are analysed.Based on the development of RevitAPI technology, a new way of displaing 3D view which is based on the spatial location is proposed.Then the key technologies are introduceed and some application examples of an assembly type steel structure are demonstrated.This method provides a reference for the development of other technologies about BIM software.
Research on Axis Generation in BIM based on CAD Drawings
Ma Cheng, Lu Xiaolong, Wang Dejiang
2016, 8(1): 43-47. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.07
[Abstract](2054) [FullText HTML] (1034) [PDF 2528KB](20)
Abstract:
This paper presents the recognition of the axis line and the numbers on axis by analyzing the data of DXF file exported from CAD drawing. After that, based on the CAD information, the program auto-generate the axis and number in BIM on the secondary development of Revit package. It reduces the time for building the BIM model from CAD drawings.
Research on Tunnel Operation and Maintenance Decision Support System based on Big Data
Hu Min, Zhang Mingzheng, Shi Yongquan, Yu Gang
2016, 8(1): 48-52. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.08
[Abstract](2105) [FullText HTML] (846) [PDF 2524KB](17)
Abstract:
In order to solve the the problems caused by diversifed information in the highway tunnel, this article analyzes the characteristics of highway tunnel and uses big data analysis and assessment of BIM technology to study the tunnel maintenance and optimization. Based on the evaluation of the whole life cycle maintenance and optimization decision method, the article describes the basic principle of whole life cycle information evaluation decision and implementation path, and makes strategic choices according to the evaluation results. Finally, innovation points and application effects of this method are summarized, and the future development trend of the tunnel maintenance evaluation is pointed out.
Technology and Quality Control of Shield Empty Across the Mining Method for Tunnel Construction
Xu Yanzhao, Li Yawei, Yang Jun
2016, 8(1): 53-58. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.09
[Abstract](2031) [FullText HTML] (940) [PDF 3032KB](15)
Abstract:
Shield method construction. as a kind of safe and effective method of tunnel construction. plays a positive role in the construction of urban rail transit in our country. However, an interval, including partial hard rock section. iS difficult for shield tunneling machine to push forward. When the hard rock drivage reaches a certain length. we usually use "shield law" + "mines" composite construction method. Although this method can improve the construction speed and reduce the construction risk, but also causes many problems. According to the actual situation of Wuhan subway construction, this paper introduces the key technologies and quality control measures of shield to shield, shield advance and receiving phase with good results in the weathered mudstone formation of the hollow push mining method in tunnel construction, providing a useful reference for similar projects.
Study on 3D Collaborative Design Platform based on Revit
Luo Qi, Li Zhiyang, Tao Haibo
2016, 8(1): 59-64. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.10
[Abstract](2723) [FullText HTML] (1161) [PDF 3027KB](31)
Abstract:
Based on Revit series software, shared folder and collaborative cloud, this article analyzes a practical project and demonstrates the functions of 3D collaborative design platform and process of 3D collaborative design. Extending 3D collaborative design, this paper can provide reference for design of similar projects.
Integration of Form and Connotation, Balance of Efficiency and Quality——Exploration of Design Methods based on Balance Theory
Wu Jimin, Zhou Weibo, Yi Duo
2016, 8(1): 65-70. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.11
[Abstract](2190) [FullText HTML] (745) [PDF 3034KB](16)
Abstract:
Design is a process of continuous development and intensification, in which originality and form mix and collide with each other constantly, and ultimately reach a balance. This is also the reflection of the quality of design. Efficiency and quality have different emphases at different stages of design. At the initial stage, a great deal of information needs to be collected and integrated to reach a conclusion. By reasonable and goal-directed collection, effective cooperation, independent and concentrated thinking, and data organization, high efficiency is realized. At the stage of intensification. the dynamic integration of "form" and "connotation" is emphasized. Based on accumulation and summary as well as personalized analysis of the form and connotation and by virtue of diversified methods of looking for the connotation, intuitive paths of thinking are put forward. Furthermore, timely communication among the participants in the plan can be guaranteed through a perfect cooperative system. This can guarantee the quality and enhance the efficiency simultaneously. Although a good method can improve the efficiency of design, it still cannot change the essence of design. Only by learning, practicing and thinking continuously can one design excellent works.
Methods for Road 3D Modeling based on CATIA
Zhang Bo
2016, 8(1): 71-74. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.12
[Abstract](2002) [FullText HTML] (1547) [PDF 2022KB](25)
Abstract:
As a powerful 3D collaborative design software, CATIA has been widely used in the field of water conservancy and hydropower engineering. The design of access road and construction road is an important part of the 3D collaborative design of water conservancy and hydropower engineering. According to the access road modeling of a Hydropower Station, this paper introduces a method of building 3D road model by using CATIA software, which is based on the results of two-dimensional design.
Super Deep Foundation Pit Supporting Design Principle and the Three-dimensional Finite Element Numerical Analysis
He Shouwen
2016, 8(1): 75-79. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.13
[Abstract](1866) [FullText HTML] (997) [PDF 2526KB](19)
Abstract:
Along with the rapid development of economy in our country, the space that a city can take advan. tage of becomes less and less. Thus, it is necessary to develop underground buildings, using deep foundation pit supporting. How to guarantee the security and the rationality of the deep foundation pit has become the important problem in the design of deep foundation pit. Based on the engineering example and using the calculation software of geotechnical principle of deep foundation pit and the finite element analysis software Midas GTS-7.0 to analyze the security of foundation pit, its analysis results can provide reference for optimization design and construction of similar projects.
Realization of Cross-platform Virtual 3D Construction Progress System
Rao Pingping, Shao Zhaotong, Zhao Linxue
2016, 8(1): 80-82, 91. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.14
[Abstract](1974) [FullText HTML] (1236) [PDF 2024KB](21)
Abstract:
Engineering construction needs visual progress management tools to integrate BIM and VR to develop a visualized and multi-terminal construction progress demonstration system with rich information. Building the standard construction model with Revit, this article modifies the texture of materials using 3DMAX and then imports the model to Unity3D SO as to develop a cross-platform construction progress system. Model information in Revit is transmitted to Unity3D in IFC format, which can be easily released to the PC. Web and mobile terminal and provide better service for construction management.
Research on the Design of the Back-Shaped Building under Earthquake
Zhang Xiuhua, Zhang Guohui
2016, 8(1): 83-86. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.15
[Abstract](1809) [FullText HTML] (796) [PDF 2022KB](15)
Abstract:
The main building of this project is 99m × 79m with a height of 60m. The structure is composed of towers of 4 different rigidity. This paper investigates the system characteristics and the seismic performances of the structure. Under the actions of multiple earthquakes, the decomposition reaction analysis and elastic time history, analysis are used to carry out calculation and stability analys is of the whole structure. Some constructional measures were employed to enhance the seismic performances of weak components so as to ensure the seismic safety of the building. The results indicate that this structure system is safe and feasible.
Realization of Revit Pipeline Auto-labeling Method
Li Changhua, Li Tong, Zhou Fangxiao, Cui Huanhuan
2016, 8(1): 87-91. doi: 10.16670/j.cnki.c.n11-5823/tu.2016.01.16
[Abstract](2251) [FullText HTML] (921) [PDF 2526KB](29)
Abstract:
Based on the actual engineering requirements of Revit pipeline auto-labeling, this paper divides parallel pipeline labels into two categories of no-adjustable and adjustable parallel pipeline labels and describes three situations which will lead to pipeline diameter changes.In addition, the paper puts forward a method of using lead vertical to solve the problem of the changeable diameter parallel pipes labeling.The experimental results show that: this kind of labeling methods greatly increase labeling efficiency, and compared to the use of Revit interactive interface, they simplifies the operation, improve the labeling efficiency and provide some experiences for secondary development in the future.
Quantity take-off software
2016, 8(1): 93-94.
[Abstract](778) [FullText HTML] (667) [PDF 671KB](13)
Abstract:
Application of Viaduct Pile Foundation Underpinning in Metro Construction
Li Wen, Jiang Shuangnan, Zuo Min, Zhou Yin
2016, 8(1): 95-99, 113. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.17
[Abstract](1844) [FullText HTML] (830) [PDF 3032KB](16)
Abstract:
Railway construction has been developed rapidly. But during the construction of a new subway, the tunnel will inevitably pass through the foundation of buildings. How to control the risk of underpinning construction and protect existing buildings becomes an inevitable challenge. The paper focuses on the management and technology used in Viaduct Pile foundation underpinning, elaborates the design, construction technology and safety monitoring work. The provided valuable experience of bridge pile foundation underpinning construction in complex environments and geological conditions is helpful to security risk management.
Information-based Risk Management of Overseas Projects
Hu Kailin
2016, 8(1): 100-104. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.18
[Abstract](1794) [FullText HTML] (1031) [PDF 2528KB](19)
Abstract:
Due to the new development structure of world economy, the new normal for the development of Chinese economy and the new markets for the "one road and one belt" strategy, it is necessary for Chinese enterprises to further expand and cultivate overseas markets. However, overseas projects have to face all kinds of risks because of such uncertain factors as political and economic environments, policy barriers and protections, legal and cultural differences and different international project operation procedures. Based on information technology, this paper analyzes various risks for overseas projects of building companies and puts forward prevention measures and approaches.
Research and Application of Concrete Construction Technology for 3D Curved Cantilever Structure
Shang Rongchao
2016, 8(1): 105-107. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.19
[Abstract](2009) [FullText HTML] (817) [PDF 1518KB](13)
Abstract:
The traditional plywood can't shape space concrete structure, and therefore, this article puts forward the concrete construction technology for 3D curved cantilever structure. This construction technology uses the supporting system of "steel plate" plus "steel keel" to prevent deformation during construction, uses steel plate cutting and assembly techniques to solve the problems of irregular changes in the surface normal direction, and uses computer 3D modeling to carry out detailed design and sample processing for the structural steel keel, which makes T-shaped steel keel structure accurately simulate the irregular changes in the longitudinal direction. Making full use of the drainage hole of the structure itself to enhance the whole modeling supporting system, this technology guarantees that the structural curve keeps smooth to meet the high standards of concrete appearances.
Influence of Empty Shield Tunneling Segment Pushed Ahead through on the Existing Tunnel
Li Zhihua, Tao Ye, Zhong Changji
2016, 8(1): 108-113. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.20
[Abstract](2065) [FullText HTML] (1229) [PDF 3031KB](18)
Abstract:
Wuhan Metro Line 6 has to go under an existing station of the 2nd line by the method of in advance tunneling construction. This article describes the construction process in advance of shield tunneling segment through a series of problems existing in the corresponding solutions, and analyzes the track surface during construction on the 2nd line of settlement and the existing station building subsidence case of using shield empty push impact on the existing tunnel. Based on Wuhan metro Line 6 tunnel, this article carries out a systematic analysis on the early application of the existing tunnel excavation method and the shield push with no-load. On this basis, the article dissusses the shield tunneling segment results from the rail surface setflement of the existing track and station building cumulative settlement. The project also uses a special precipitation and strengthening programs to reduce the impact of the construction process on the existing line operator and provides a useful reference for similar engineering.
Design Project Management of Project Management Informatization
Yang Jixing
2016, 8(1): 114-117. doi: 10.16670/j.cnki.cn11-5823/tu.2016.01.21
[Abstract](1798) [FullText HTML] (847) [PDF 2021KB](25)
Abstract:
This paper introduces the structure and business process of design projects of a comprehensive design organization, and then demonstrates a design project management information system based on the business process. Finally, the paper shows the business functions, job definitions and function distributions of the system.
  • Copyright © Journal of Information Technologyin Civil Engineering and Architecture Editorial Office
  • 京ICP备17057008号
  • Address:No.30 Bei San Huan Dong Lu,Beijing 100013,China
  • Tel:010-64517910 Postcode:100013
  • Wechat:tmjzgcxxjs  QQ:3676678954  E-mail:tmqk@cgn.net.cn