Citation: Liang Jiahong, Jiang Fen, Huang Zhiqin, Yang Haimin, Lan Jinling, Tan qiu. Enterprise-Level Application of BIM Technology in Lebainongyi Tunnel Project in Guangxi. Journal of Information Technologyin Civil Engineering and Architecture, 2019, 11(1): 84-96. doi: 10.16670/j.cnki.cn11-5823/tu.2019.01.13
2019, 11(1): 84-96. doi: 10.16670/j.cnki.cn11-5823/tu.2019.01.13
Enterprise-Level Application of BIM Technology in Lebainongyi Tunnel Project in Guangxi
1. | Guangdong Branch of Hunan Hongyuan Zhongzhu Project Management Co., Ltd., Guangzhou 510000, China |
2. | Guangdong Liede Engineering Intelligent Management Co., Ltd., Guangzhou 510000, China |
3. | Guangdong Provincial ChangDa Highway Engineering Co., Ltd., Guangzhou 510000, China |
The Lebainongyi Tunnel is a super-long tunnel. During the construction of the tunnel, considering the complicated geological structure, the quality and safety of the tunnel are strictly controlled. The geological prediction data of tunnel excavation is particularly important, which is necessary to eliminate the adverse geological water-mark conditions in front. At the same time, the statistics of over-excavation or under-excavation quantities in the process of tunnel excavation has become a difficult point in traditional construction. In addition, new project management tools are urgently needed to help improve the efficiency of collaborative management, such as real-time recording and updating of tunnel uneven settlement monitoring data and on-site progress, quality and safety. In view of the above key difficulties in tunnel construction, the project team adopted the BIM solution of Revit + Dynamo + Civil 3D + BIM 5D after several comparisons and analyses of different BIM software series, which can solve the management and application problems from BIM model construction to various stages of the project, such as statistical analysis of bill quantities, construction schedule management based on the daily standard unit, positioning by pile number per extended meter assisting solving the construction quality and safety problems, and etc. The BIM solution used by the tunnel project is able to deepen the model according to the actual construction information data, and to help solve the difficulties of traditional tunnel construction in multi-direction and multi-angle. The research results of this project can provide professional technical solutions for similar highway engineering BIM applications.
[1] |
何关培, 黄锰钢.十个BIM常用名词和术语解释[J].土木建筑工程信息技术, 2010, 2(2): 112-117.doi: 10.3969/j.issn.1674-7461.2010.02.023 |
[2] |
何关培. "BIM"究竟是什么?[J].土木建筑工程信息技术, 2010, 2(3): 111-117.doi: 10.3969/j.issn.1674-7461.2010.03.019 |
[3] | |
[4] | |
[5] |
闫文凯, 张国栋.通过BIM平台让数据从设计流动到施工[J].土木建筑工程信息技术, 2015, 7(1): 41-43.doi: 10.3969/j.issn.1674-7461.2015.01.008 |
[6] |
饶平平, 梁晓东, 刘佳新, 等.基于BIM的施工信息管理平台的应用[J].土木建筑工程信息技术, 2017, 9(3): 96-103. |
[7] |
李政, 陈杨泽, 杨远丰, 等.建设方主导的BIM项目管理实践与思考——以保利鱼珠项目为例[J].土木建筑工程信息技术, 2018, 10(5): 1-9. |
[8] |
曹继亮.BIM技术在公路工程造价管理中的应用探索[J].中国科技纵横, 2015(22): 88-89.doi: 10.3969/j.issn.1671-2064.2015.22.073 |
[9] |
何关培.中国BIM标准个人思考(一)[J].土木建筑工程信息技术, 2012, 4(3): 56-61.doi: 10.3969/j.issn.1674-7461.2012.03.009 |
[10] |
何关培.中国BIM标准个人思考(二)[J].土木建筑工程信息技术, 2013, 5(2): 107-112.doi: 10.3969/j.issn.1674-7461.2013.02.019 |
[11] |
罗嫦玲, 李珏.基于内容分析法的中、美、英三国BIM标准的研究[J].土木建筑工程信息技术, 2018, 10(6): 21-26. |
[12] |
黄亚斌.企业级BIM应用实施步骤(一)[J].土木建筑工程信息技术, 2011, 3(2): 56-61.doi: 10.3969/j.issn.1674-7461.2011.02.011 |
[13] |
黄亚斌.企业级BIM应用实施步骤(二)——中建西南设计院BIM应用实施案例介绍[J].土木建筑工程信息技术, 2011, 3(4): 42-50.doi: 10.3969/j.issn.1674-7461.2011.04.009 |
[14] |
黄亚斌. BIM技术在设计中的应用实现[J].土木建筑工程信息技术, 2010, 2(4): 71-78.doi: 10.3969/j.issn.1674-7461.2010.04.014 |
[15] |
许洪春, 王丽珂, 林基础.工程项目组织自组织性分析[J].土木建筑工程信息技术, 2010, 2(4): 94-98.doi: 10.3969/j.issn.1674-7461.2010.04.017 |
Metrics
- PDF Downloads(34)
- Abstract views(2741)
- HTML views(1048)